Financial process/pricing
Flexible Project Financing Options
LBX Southern understands that construction and property improvements are major investments. We work with customers to help simplify the planning and budgeting process while supporting financing-friendly project structures whenever possible.
Financing May Be Available For:
- Concrete Construction Projects
- Site Development Services
- Excavation & Grading
- Home Renovations
- Property Improvements
- Retaining Walls & Drainage Systems
- Emergency Repairs
- Turnkey Building Solutions
- Disaster Recovery Projects
Financing Benefits
✅ Easier Budget Management
✅ Flexible Payment Structures
✅ Larger Project Accessibility
✅ Faster Project Start Times
✅ Investment Protection Through Professional Construction
TRANSPARENT ESTIMATING
Clear & Detailed Project Estimates
LBX Southern believes clients deserve honest, detailed, and understandable project estimates. Our estimating process focuses on transparency, realistic scheduling, and clearly defined project expectations.
Our Estimates Typically Include:
- Scope of Work
- Material Costs
- Labor Requirements
- Equipment Needs
- Site Preparation Requirements
- Scheduling Expectations
- Safety & Compliance Considerations
- Cleanup & Project Completion Details
Why Detailed Estimates Matter
Detailed estimates help reduce misunderstandings, improve project planning, establish realistic budgets, and ensure clients understand exactly what is included in the project scope.
LBX Southern Service Pricing Structure
NOTE: Pricing varies based on site conditions, accessibility, material costs, travel distance, permitting requirements, environmental conditions, emergency response timing, and project complexity. These are baseline market pricing structures for estimating and budgeting purposes.
CONCRETE CONSTRUCTION SERVICES
•Typical Starting Price
Concrete $4 - $8 sf
•Decorative/Stained Concrete
$15-$28 per SF
•Area and I am in Footings & Foundations
$14-$28 per SF
•Retaining Walls
$55-$140 per LF
•Concrete Demolition
$4-$10 per SF
•Saw Cutting
$8-$18 per LF
•Concrete Repair Work
$950 minimum service call
•ADA Ramps
$4,500-$25,000+
•Commercial Flatwork
$10-$22 per SF
SITE DEVELOPMENT & LAND MANAGEMENT
•Land Clearing
$2,500-$15,000+
•Grading & Site Prep
$2,000-$20,000+
•Rough Grading
$150-$300 per hour
•Fine Grading
$125-$225 per hour
•Drainage Installation
$2,500-$25,000+
•Erosion Control
$1,500-$15,000+
•Culvert Installation
$2,500-$12,000+
•Gravel Driveways
$4-$9 per SF
•Stormwater Systems
$5,000-$50,000+
•Access Road Construction
$8-$20 per SF
EXCAVATION SERVICES
•Excavation Work
$150-$300 per hour
•Foundation Excavation
$2,500-$12,000+
•Trenching
$8-$25 per LF
•Utility Excavation
$3,000-$20,000+
•Septic Excavation
$3,500-$15,000+
•Demolition Excavation
$2,500-$25,000+
•Rock Excavation
Custom Pricing
•Emergency Excavation
Premium Emergency Rates
ENVIRONMENTAL MANAGEMENT SERVICES
•Site Stabilization
$2,500-$20,000+
•Storm Cleanup
$1,500-$50,000+
•Debris Removal
$500 minimum
•Environmental Remediation Support
Custom Pricing
•Erosion Repair
$2,000-$15,000+
•Emergency Environmental Response
Emergency Rates Apply
•Sediment Control Systems
$1,500-$10,000+
•Disaster Recovery Operations
Custom Large-Scale Pricing
DISASTER RELIEF & EMERGENCY SERVICES
•24/7 Emergency Mobilization
$1,500 minimum
•Storm Damage Response
Emergency Rates Apply
•Emergency Stabilization
$2,500+
•Emergency Debris Removal
$750 minimum
•Temporary Access Restoration
$2,500+
•Flood Damage Cleanup Support
Custom Pricing
•Emergency Sitework
Premium Hourly Rates
•After-Hours Response
1.5x-2x Standard Rates
CONSULTING & PROJECT MANAGEMENT FEEs
•Initial Site Consultation
FREE within local service area
•Detailed Project Consultation
$150-$350
•Construction Planning Consultation
$250-$750
•Project Budget Development
$350-$1,500
•Scope Development & Estimating
$250-$2,500
•Government Proposal Assistance
$1,500-$15,000+
•Construction Management Consulting
$85-$175 per hour
•Expert Site Evaluation
$250-$950
•Emergency Response Planning
Custom Pricing
•Owner Representation Services
% Based or Hourly
MINIMUM SERVICE FEES
•Small Equipment Mobilization
$500
•Concrete Repair Calls
$950
•Emergency Calls
$1,500
•Excavation Mobilization
$1,250
•Demolition Mobilization
$1,500
•After-Hours Service Calls
Premium Rates Apply
PAYMENT STRUCTURE
Typical Payment Schedule
- 10%-30% Mobilization Deposit
- Progress Payments Based on Milestones
- Material Billing As Required
- Final Payment Due Upon Completion
Accepted Project Structures
- Fixed Price Contracts
- Cost Plus Contracts
- Unit Price Contracts
- Time & Materials
- Commercial & Government Bid Structures
WHY LBX SOUTHERN PRICING IS STRUCTURED THIS WAY
LBX Southern pricing reflects:
- Equipment operating costs
- Fuel and transport
- Skilled labor requirements
- Insurance and compliance costs
- Safety systems and operational oversight
- Material fluctuations
- Project complexity
- Emergency response readiness
- Environmental protection requirements
We focus on delivering professional, reliable, and properly managed construction services while maintaining realistic pricing structures that support safety, quality, accountability, and long-term project success.
People often think construction pricing is “just concrete and dirt” until they see what diesel fuel, insurance, OSHA compliance, and hydraulic hose failures cost in real life. The earth itself charges hidden fees now. 🚜